Skip to content
PRESTIGEWOOD
Flooring Installation

Service

Flooring Installation

Supplied and laid by our own crews, so nobody can blame the other trade.

Most flooring problems start at the handover between supplier and installer. We remove that handover: the same team quotes the material, preps the subfloor and lays it.

How it works

The process, step by step

  1. 01

    Site measure

    We measure on site, not off a plan.

  2. 02

    Quote and samples

    Fixed-price quote with samples you keep.

  3. 03

    Subfloor preparation

    Moisture testing and levelling before any board goes down.

  4. 04

    Install and hand over

    Laid, finished and cleaned before we leave.

Questions

Flooring Installation FAQs

It depends on the area and the subfloor. Most homes run two to five days.

Talk to us about your project

Flooring Installation | PRESTIGEWOOD