
Service
Flooring Installation
Supplied and laid by our own crews, so nobody can blame the other trade.
Most flooring problems start at the handover between supplier and installer. We remove that handover: the same team quotes the material, preps the subfloor and lays it.
How it works
The process, step by step
- 01
Site measure
We measure on site, not off a plan.
- 02
Quote and samples
Fixed-price quote with samples you keep.
- 03
Subfloor preparation
Moisture testing and levelling before any board goes down.
- 04
Install and hand over
Laid, finished and cleaned before we leave.
Questions
Flooring Installation FAQs
It depends on the area and the subfloor. Most homes run two to five days.
Yes — twelve months on workmanship, on top of the manufacturer warranty.
