
Project
Eden Park
A new build where the floor was specified before the slab was poured, so moisture testing was built into the programme rather than bolted on.
- Location
- Melbourne, VIC
- Type
- Premium residence
- Scope
- Full supply and installation
- Builder
- Client's builder
- Designer
- Client's architect
- Completed
- 2023
A new build where the floor was specified before the slab was poured, so moisture testing was built into the programme rather than bolted on.



